Tilly819
6th June 2009, 12:13 AM
As the title inplys
I have this coming week off work to work on my 7 i hope to get quite abit done.
1) Get prop balanced / make adapter (need a peice of 3 1/2 x 6 inch round steel bar for this if anyone has abit nocking around neer nottingham ;)
2) Run brake and fuel pipes found a local place that makes up SS braided hoses quite cheep
3) make fuel tank with integral swirl pot (no need for a header tank)
4) get fuel pump
5) finish off pedal box
6) mount rad and oil cooler
Ps GOT THE ENGINE RUNNING LAST NIGHT WHOOOOO :D :D
managed to figure out how the imobaliser worked and a few cough cough splutter splutters later off it went on its jolly way to 10500 RPM with no exaust....was quite load :D
Chears Tilly
I have this coming week off work to work on my 7 i hope to get quite abit done.
1) Get prop balanced / make adapter (need a peice of 3 1/2 x 6 inch round steel bar for this if anyone has abit nocking around neer nottingham ;)
2) Run brake and fuel pipes found a local place that makes up SS braided hoses quite cheep
3) make fuel tank with integral swirl pot (no need for a header tank)
4) get fuel pump
5) finish off pedal box
6) mount rad and oil cooler
Ps GOT THE ENGINE RUNNING LAST NIGHT WHOOOOO :D :D
managed to figure out how the imobaliser worked and a few cough cough splutter splutters later off it went on its jolly way to 10500 RPM with no exaust....was quite load :D
Chears Tilly