Well Schools out for about six weeks so I have time to work on the car starting this week. First thing I did this week was to make a small electrolysis tank (2gallon bucket) may have to make a bigger one as it works really well.
I also got all my transmission tunnel tacked in place including making the hand brake lever.
Next is CP11 I have the already laser cut from 2mm steel just need to bend the 25mm X 2 mm strip round them.
After that fit the front diagonals and now I can also fit the seat back diagonals with those dreaded compound angles.
Then weld up all the tacked rear and transmission tunnel.
check out the blog for details and pics
![Big Grin](images/smilies/biggrin.gif)