View Single Post
  #29  
Old 19th March 2014, 08:56 AM
thailoz thailoz is offline
Senior Member
 
Join Date: Mar 2013
Location: Thailand
Posts: 140
Default holiday time

Well Schools out for about six weeks so I have time to work on the car starting this week. First thing I did this week was to make a small electrolysis tank (2gallon bucket) may have to make a bigger one as it works really well.

I also got all my transmission tunnel tacked in place including making the hand brake lever.

Next is CP11 I have the already laser cut from 2mm steel just need to bend the 25mm X 2 mm strip round them.
After that fit the front diagonals and now I can also fit the seat back diagonals with those dreaded compound angles.
Then weld up all the tacked rear and transmission tunnel.

check out the blog for details and pics
__________________
My build diary is at http://thailoz.wordpress.com/
Reply With Quote