View Single Post
  #49  
Old 30th November 2009, 10:23 PM
gingea1pom's Avatar
gingea1pom gingea1pom is offline
Senior Member
 
Join Date: Sep 2009
Location: wiltshire
Posts: 826
Default

Actually cracked on a little this afternoon, I cut RS11 and 12 from 19 x 19 tube then realised they should be cut from 25 x 25 tube so took a breath and cut them from the correct size tube, and to my amassment they have another compound cut on one end, I am getting quite good at them now. Fully welded the suspension frame to CP1 and 2 as I flipped the chassis over to weld the underside of RS11 and 12.

The garage needs a good tidy up then I can start to construct CP3 and 4 on the weld table. I need to get a stock of nuts and bolts, I was thinking M8, 10 and 12 in full nut, Nylock nut complete with bolts in varying lengths, any top tips would be helpful.
__________________
Sent from my iPad, from who knows where in the world

I was building but I am not now!


Build Pictures


Build Thread
Reply With Quote