I have spent about 5 hrs sitting on the dining room floor, with the loom, the oficial diagram, meter and snips.
All the Window, Mirror, CLM, Fuel Puta, AWS, Lamp Failure, Wiper, Washer, Front Fog, Dash Dimmer, Wiper Speed, Stereo, Fag Lighter, ABS Feed, Interior Lighting, And other assorted crap has been cut out.
Some wires are awaiting re-joining especialy for the removal of the lamp failure module. The loom I had was also missing the loom from the A-Pillar back so that will need making up.
Next stage is to split down the sections and terminate on multiplugs to make the loom PLUGGABLE.
TT
|