View Single Post
  #8  
Old 9th September 2010, 05:24 PM
tex tex is offline
Senior Member
 
Join Date: Apr 2010
Location: stockton on tees
Posts: 119
Default

the wiring should be ok to run down the tunnel with the fuel pipes.
if i were doing it i would run the wiring loom in convoluted tubing wrapped with tape and on the opposite side to the fuel pipes. makes no odds but keeps space taken up more even. just avoid sharp edges and moving parts as best you can
Reply With Quote