7:15 PM start fitting driveres side tunnel and floor. Including spreading the evil gunge, loading the rivets ( tapping in the stubborn ones ) and popping them.
Drilled the seat mounts through floor, added extra rivet holes for seat mount rails, and rivited..
9:15 PM glass of wine
Next task is the seat back, but I need another tube of evil gunk for that.
TT