View Single Post
  #3  
Old 26th July 2010, 06:59 PM
HandyAndy's Avatar
HandyAndy HandyAndy is offline
Senior Member
 
Join Date: Jan 2009
Location: cleveland
Posts: 3,917
Default

Thanks for that Dave, I was thinking along the same line as you, but I,d like my indicators more to the front of the nose, as the FF2 FF3 parts of the front frame are quite far back within the nose area,

Tho your diagram has given me an idea

How about welding a nut in both ends of the steel tube, & a large "Penny" washer at the end that meets the nose, then use a bolt & large washer on the inside of the nose into the extension bar, only awkward thing I can see is the angle of the extension tube so that the tube is parrallel with the frontal aspect of the nose, as there isn,t a "flat" on the side of the nose, all curves & bumps etc ........hmmmmmm

Thanks for the offer of the steel tube, I,m ok as I have some too.

cheers
andy
Reply With Quote