Hi David,
The manual says that all cables / pipes must be securely fitted at a max 300mm intervals and free from chafing. This reduces in the tranny tunnel though and needs to be every 150mm, preferably laid on a channel.
AndyH
Last edited by spud69 : 21st October 2011 at 04:56 PM.
Reason: Correct by TT ;-)
|