View Single Post
  #261  
Old 22nd November 2014, 08:23 PM
Tatey's Avatar
Tatey Tatey is offline
Senior Member
 
Join Date: May 2009
Location: Leicester
Posts: 827
Default

I've managed to make quite a lot of progress today after all of my bits arrived. Today I managed to fit my roll over valve + breather end cap/filter, fit my vacuum take off for Megajolt, finish off my cooling system (minus a few hose clips), including P-clipping hoses in place and finally I have ran my throttle cable, I just need to attach it to the pedal which is tomorrows job.

Tomorrows job is to finish off the throttle cable, wire up my front indicators, wrap my exhaust, finish off my pedal box, sort out my brake actuator to get it to the right length, fit pedal stops (both forwards and rearwards).

Pictures speak more than words so here are some:







__________________
1.8 Silvertop Zetec (ZX6R Carbs + Megajolt) + Type 9

My Build Blog: http://www.haynes.co.uk/forums/showthread.php?t=2736 - Last Update: 31st October 2020

Total Spent so far: Stopped counting
Reply With Quote