View Single Post
  #2  
Old 17th September 2012, 01:51 PM
deezee's Avatar
deezee deezee is offline
Senior Member
 
Join Date: Jan 2009
Location: Wirral
Posts: 744
Default

I marked the rear wings up, then where the flange met chassis rails I fitted rivnuts. Where the flange didn't pass over chassis rails the other fixings are just bolts through the bodywork. About 6 bolts for each arch.
__________________
Built/IVA'd Roadster - RS2000 16v, ZX6R, Megajolt
Reply With Quote