Thread: what next?
View Single Post
  #4  
Old 20th October 2013, 10:18 AM
Enoch Enoch is offline
Senior Member
 
Join Date: Nov 2009
Location: Near Boston, Lincolnshire
Posts: 788
Default

You don't need the body work just a very rough idea of where everything is going. I left all my wires about 3 ft longer than I needed then just cut them to length once I had everything mounted / attached. The way I made the loom was to use the building board - I put a nail in the board anywhere that the loom had to make a turn and just wrote the names of each light etc on to the board. Once it was all laid out neatly you can wrap it in looming tape and the jobs a good un.
Reply With Quote