|
#1
|
|||
|
|||
A bit of progress
Well i've made a bit of progress at last,
Chassis has been painted, did that take for ever, some of the body's been fitted and hopefully the engine will be in by the weekend. P5190026.JPG P6270060.JPG |
#2
|
||||
|
||||
Have you got your floors in yet? I have made a start on my bodywork and the sides wont go on with my floor in place, I have had to trim the lower lip of part of the sides.
TT
__________________
You only get a woosh with a dump valve Build Thread Man Cave Mantiques Cecil Street Auto Repairs Garage Carlisle Build Cost £4181.65 - Last - Wheel Cylinders |
#3
|
|||
|
|||
Yes my floor is fitted, i had the same problem with the sides TT.
I used a flap disc and hoover to smooth the back of the fibreglass, i also rounded the edge of the ally floor. Terry |
#4
|
|||
|
|||
Why the trouble fitting the side panels?
|
#5
|
|||
|
|||
I had slight problem with thickness of the fibreglass in a couple of places.
Terry |
#6
|
|||
|
|||
I'm having the same problems with mine, I've had to cut holy f*ck out of them and they still ain't fitting properly. Trouble is u do all the hard work building the car then a couple of ill fitting panels make it look shit.
|
Thread Tools | |
Display Modes | |
|
|