![]() |
#21
|
||||
|
||||
![]() Quote:
Yes lucky enough I too read plenty of build threads and read advice from other builders so I have slackened the nuts off using a 4ft bar! Anything else I need to keep off the shell Before it goes? I have cut the chassis number off and removed the chassis ID plate and cut out the bracket for the handbrake. |
#22
|
||||
|
||||
![]() Have you kept the fuel sender from the top of the tank
|
#23
|
||||
|
||||
![]() Yes I have removed the sender unit and the other bit which I assume is a return?
|
#24
|
|||
|
|||
![]() fuel sender has flow and return, the other bit is a vent
|
#25
|
||||
|
||||
![]() The donor has been completely stripped down now have a big pile for the tip and another pile of bits to sell and help fund the build.
Build table has now been built and I have marked out all the bottom rails. [IMG ![]() [IMG] ![]() Only recently managed to check the chassis kit out, couple of bits missing nothing major so think I will cut them myself. In fact some may not be used or be different on the talon chassis compared to the book chassis. [IMG] ![]() |
#26
|
||||
|
||||
![]() Quote:
__________________
God loves a trier Actual cost so far = Have chosen to stop counting incase I incriminate myself - ![]() Cost ive told the wife = A hell of a lot less than I have spent. - ![]() |
#27
|
|||
|
|||
![]() thats the gearbox mount in the picture, bit box section two inch wide cut at angle on both ends with slot in the middle. bolt a landrover rubber mount and 50mm square box on top.
i will try measure mine tomorrow |
#28
|
||||
|
||||
![]() Thanks for that. I assume it's easier to cut it and place it once the front mounts are in.
__________________
God loves a trier Actual cost so far = Have chosen to stop counting incase I incriminate myself - ![]() Cost ive told the wife = A hell of a lot less than I have spent. - ![]() |
#29
|
||||
|
||||
![]() I wondered what that bit was thanks guys.
If you want me to I will take some close up pictures of it and measure it too. I'm missing all bits for the front frame, which obviously I do need. I have started marking out the bits on some box section I bought for welding practice. Much head scratching on FF2 and FF3 but think I have it right now! Also missing are: SB 3, 4, 5 & 6 I'm guessing these are as per the book RS 15 again I'm guessing these are the same as in the book SW 1, 2 & 3 which I assume are different from the book? TT 6 & 8 not sure if these are used? Cheers Dean |
#30
|
||||
|
||||
![]() Get hold of phil he will get them sent out to you
|
![]() |
Thread Tools | |
Display Modes | |
|
|