Haynes Forums  

Go Back   Haynes Forums > Haynes Roadster Forums > Chassis
FAQ Members List Calendar Search Today's Posts Mark Forums Read

Reply
 
Thread Tools Display Modes
  #21  
Old 24th July 2010, 04:59 PM
David_17's Avatar
David_17 David_17 is offline
Senior Member
 
Join Date: May 2010
Location: Teesside
Posts: 544
Default

Thanks for the help guys, spent ages today holding the little triangle all over the chassis, then finally found it!

My grinder packed in this afternoon, but when i got home found that it was just a wire had snapped inside the flex. So can crack on again tomorow.

By the end of tomorow i hope to have the rest of the wishbones cut (and possibly weld one or two) and get the suspension brackets and seat rails welded on the chassis.

Then i'm waiting to get some M8 nuts for the roll bar mounts (i've only got stainless ones at the moment) which means i can get the back end of the chassis finished, then some 7/16 unf nuts for the seatbelt mounts (the shop that sells them is only open mon-fri 9-4.30 when i'm ususally at work)





After that, the chassis is about finished, besides engine mounts and headlamp brackets
__________________
~

My Build Diary - http://davesroadster.blogspot.com/

*updated 7/6/11*

Best bit so far: Getting it running
Worst bit so far: Cutting steel for wishbones and engine mounts.
Most annoying bit so far: Generator packing up half way through welding.

Last edited by David_17 : 24th July 2010 at 05:04 PM.
Reply With Quote
Reply


Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump


All times are GMT +1. The time now is 11:05 PM.


Powered by vBulletin® Version 3.6.4
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.