Haynes Forums  

Go Back   Haynes Forums > Haynes Roadster Forums > Announcements
FAQ Members List Calendar Search Today's Posts Mark Forums Read

 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
  #1  
Old 6th June 2009, 01:13 AM
Tilly819 Tilly819 is offline
Senior Member
 
Join Date: Oct 2008
Location: Leicestershire
Posts: 489
Talking woo. Got a week off to work on the car !

As the title inplys

I have this coming week off work to work on my 7 i hope to get quite abit done.

1) Get prop balanced / make adapter (need a peice of 3 1/2 x 6 inch round steel bar for this if anyone has abit nocking around neer nottingham

2) Run brake and fuel pipes found a local place that makes up SS braided hoses quite cheep

3) make fuel tank with integral swirl pot (no need for a header tank)

4) get fuel pump

5) finish off pedal box

6) mount rad and oil cooler

Ps GOT THE ENGINE RUNNING LAST NIGHT WHOOOOO
managed to figure out how the imobaliser worked and a few cough cough splutter splutters later off it went on its jolly way to 10500 RPM with no exaust....was quite load

Chears Tilly
Reply With Quote
 


Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump


All times are GMT +1. The time now is 06:12 AM.


Powered by vBulletin® Version 3.6.4
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.