Haynes Forums  

Go Back   Haynes Forums > Haynes Roadster Forums > General discussion
FAQ Members List Calendar Search Today's Posts Mark Forums Read

 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
  #25  
Old 22nd November 2014, 08:23 PM
Tatey's Avatar
Tatey Tatey is offline
Senior Member
 
Join Date: May 2009
Location: Leicester
Posts: 827
Default

I've managed to make quite a lot of progress today after all of my bits arrived. Today I managed to fit my roll over valve + breather end cap/filter, fit my vacuum take off for Megajolt, finish off my cooling system (minus a few hose clips), including P-clipping hoses in place and finally I have ran my throttle cable, I just need to attach it to the pedal which is tomorrows job.

Tomorrows job is to finish off the throttle cable, wire up my front indicators, wrap my exhaust, finish off my pedal box, sort out my brake actuator to get it to the right length, fit pedal stops (both forwards and rearwards).

Pictures speak more than words so here are some:







__________________
1.8 Silvertop Zetec (ZX6R Carbs + Megajolt) + Type 9

My Build Blog: http://www.haynes.co.uk/forums/showthread.php?t=2736 - Last Update: 31st October 2020

Total Spent so far: Stopped counting
Reply With Quote
 


Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump


All times are GMT +1. The time now is 11:53 PM.


Powered by vBulletin® Version 3.6.4
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.