Originally Posted by spud69 View Post
Put them flush with the outer edge of TR1 and TR2 but just tack them for now. If you can then certainly place them as far out as you while lining up the upper wishbone brackets. You can also line up the steering column at the same time making sure you have some clearance for the column. When welding the extension to the column just make sure that it is not eccentric as this will move it towards the upright as you turn the column.

It's not too bad....>AndyH
note its the top outer back corner that needs to be flush and grind off the bit that sticks out after welding (even more tricky if you use 2mm wall tube with a larger radius corner)
i lined mine up flush at the top outer front corner and i have had to put packing in
Reply With Quote
  #12  
Old 15th September 2011, 02:19 PM
CTWV50's Avatar
CTWV50 CTWV50 is offline
Senior Member
 
Join Date: Aug 2010
Posts: 1,297
Default

So glad I waited till I had my wishbones, brackets and an accurate jig before I put in U1 and U2, made things so much easier and the bracket sits snug against them. Piece of mind really.
Reply With Quote
Reply


Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump


All times are GMT +1. The time now is 02:57 PM.


Powered by vBulletin® Version 3.6.4
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.