#1
|
|||
|
|||
Floor Riveting Order
I have been wondering in what order is the floor installed? Assuming aluminum, do you bond the floor with Sikaflex then drill the rivet holes or drill the holes then apply the Sikaflex?
If it is the latter how do you keep the Clecos from getting stuck or at least covered in PU adhesive? |
Thread Tools | |
Display Modes | |
|
|