TheArf
20th March 2014, 11:32 AM
Well the boss gave me my spending money for the next fifteen years and let me go shopping, so on Saturday Ayjay and I are going to collect my next project which is a fake snake.
It's a rolling chassis and the body has not been touched. The guy selling it had three of them, one completed, one part completed and the one I have bought.
It comes with a 3.5ltr V8 rover engine SD1 gearbox and is on Granada running gear.
The plan is to keep it in work and next term get a student to redesign the front suspension as a project and fabricate it here.
I think we might get some second year students to strip down the engine to see what condition it is in ready for re-build under supervision and by doing it in work I am hoping that it won't interfere with the roadster
Arfon
It's a rolling chassis and the body has not been touched. The guy selling it had three of them, one completed, one part completed and the one I have bought.
It comes with a 3.5ltr V8 rover engine SD1 gearbox and is on Granada running gear.
The plan is to keep it in work and next term get a student to redesign the front suspension as a project and fabricate it here.
I think we might get some second year students to strip down the engine to see what condition it is in ready for re-build under supervision and by doing it in work I am hoping that it won't interfere with the roadster
Arfon