Haynes Forums

Haynes Forums (http://www.haynes.co.uk/forums/index.php)
-   Running gear (http://www.haynes.co.uk/forums/forumdisplay.php?f=5)
-   -   uprights modification (http://www.haynes.co.uk/forums/showthread.php?t=4980)

jason 13th August 2012 05:33 PM

Mushroom Fixing
 
Hi all.

Just been reading this thread and getting suitably confused. Can anyone shed any light on how to do the second fixing for the mushroom adaptor, please.:confused:

flyerncle 13th August 2012 08:09 PM

Drill the hub and mushroom and tap both to fit a securing bolt through them.

jason 14th August 2012 08:17 AM

Thanks for that, simply really. :o

Stumaso 31st August 2012 06:07 PM

Hi. Does anyone know what the offset measurement is and what type of secondary fitting is recommended. Thanks. Stuart

TheArf 31st August 2012 07:07 PM

Stu if you look at a post I put up in this section, just a few lower than this one you will see that I asked about the drawings for these and alga has a link in his stickys

Arfon


All times are GMT +1. The time now is 11:34 PM.

Powered by vBulletin® Version 3.6.4
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.