Haynes Forums

Haynes Forums (http://www.haynes.co.uk/forums/index.php)
-   General discussion (http://www.haynes.co.uk/forums/forumdisplay.php?f=10)
-   -   New Build thread (http://www.haynes.co.uk/forums/showthread.php?t=4493)

mgglep 4th October 2012 10:37 PM

I did exactly the same thing I used 3 mm Ali for floor and tank I used 3/16 rivets and sika I used countersunk rivets on the edge where the side panels go I am hoping the panels will go over

K4KEV 5th October 2012 01:58 PM

Queer thing is Andy my current Ebay feedback is 999 ....me thinks something devilish is going on:D :D
mg you should be ok as long all the dimensions are correct but it will be close, which is what you want anyway:D

K4KEV 6th October 2012 12:27 AM

Started on pipework today and got some p clipped inside the trans tunnel
the ally I'm using to mount p clips to is a corner strengthener that plasterers use
I cut along the apex to give me two flat bits.
I purposely left the nearside floor off to make fitting the pipes easier





Oscar 6th October 2012 08:46 PM

This is what I love about this forum, the ingenuity!

Will have to have a word with my cousin (a master plasterer) about getting some of that, the greatest form of flattery is imitation! ;)

K4KEV 7th October 2012 01:47 AM

good progress today....have just about completed the petrol and brake pipe mounting throughout the trans tunnel, got a bit busy on that side so decided to mount the loom clips on the other side....will be getting the other floor on later today
I did manage to do the trans tunnel with just 10 fixings
from the engine bay


complicated bending near the diff mount


one of Sylvains flexy lines was easy to hop over the fuel feed/return

robo 7th October 2012 08:27 AM

Quote:

Originally Posted by Oscar (Post 78880)
This is what I love about this forum, the ingenuity!

Will have to have a word with my cousin (a master plasterer) about getting some of that, the greatest form of flattery is imitation! ;)

I reckon Chapman would have been proud of that one Kev:)

Bob

voucht 7th October 2012 09:40 AM

Very neat installation Kev, it is brilliant (and looks good :) )
Just a question: why the central brake line has to cross the fuel lines? Why haven't you routed the fuel lines all the way on top of the brake line, which would have been routed all the way on the lowest part of your ally strip? It would also have allowed a larger curve-radius on the bend of the brake line to turn around CP14 and connect to the tee-piece.
But I'm sure there is a reason ;)

The V8 Files 7th October 2012 10:37 AM

Liking the progress Kev

K4KEV 7th October 2012 04:37 PM

Mmmm....might try to swap those around Sylvain or at least top one for bottom one.....got the diff area all p clipped off
rob....I will list everything that I have used as a part off at the end of my build and the list will be quite comprehensive





plastic clips pop riveted on to hold loom in place

K4KEV 9th October 2012 11:26 AM

I have had a little rethink regarding my pipework down the trans tunnel.....not having the diff or handbrake cable mounted meant my guesswork regarding them was way out, so I have reworked them to clear the above items, one pipe I had to feed through the diff bracket which worked out quite well and I have moved the brake pipe down to the bottom to stop from crossing over as Sylvain pointed out, so here are the new trans tunnel pipework photo's

From the engine bay


to the tank (feed & return) with homemade olives soldered on


getting around the diff with out fouling


another angle


All times are GMT +1. The time now is 01:47 PM.

Powered by vBulletin® Version 3.6.4
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.