![]() |
Looks like my build is going to be delayed...
As I've gotten myself a placement job working for Triumph Motorcycles, as a design engineer on the power-train side of things.
The job means I'll be having to move down south, which is about a 3 and a half hour drive from my house. But I'll finish at 1pm on a Friday, meaning I should be able to come up a few weekends a month to do some work on the car. So hopefully I'll have the car finished by the summer of 2011, instead of Jan 2011. |
Excelent.
Good luck on the placement. TT |
Sounds a good placement to me.
Make the most of it......AndyH |
Sounds like a very nice placement Tatey :) :cool:
That's one of the best things about building the Roaster .... You can arrange the build to suit the time you have available. Just think .... During that extra 6 months, you'll be able to save up for a bit more bling for the build ;) :) |
congratulations Tatey :cool:
thats a great placement, i,m sure you,ll really enjoy your time there, maybe get to ride the bikes too :cool: when do you start? cheers andy |
Wow that sounds like a great opportunity.
|
Good luck Simon,the Roadster will be there when you get back.
|
Congrats and good good luck on the placement. Just think you could end up with a BEC.
J |
All times are GMT +1. The time now is 02:14 PM. |
Powered by vBulletin® Version 3.6.4
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.