![]() |
WTD 25 x 50 RHS
Hi
I was wondering if anybody bought a 6m length to do sb1 on the Haynes chassis so has some left over, I don't want to buy a complete length myself as I only need 1.1m. Of course I'd be happy to pay what it's worth.... Matt |
Hi, I think most people just weld 2 pieces of 25x25 together, I certainly did & it saves mucking about and expense.
Cheers, Dennis. |
Airhead,
I too use two pieces of 25 x 25 welded together.:D Cheers Ginge |
Hi Matt
I believe most folk have just used a couple of pieces of 25 X 25 instead of a single piece of 25 X 50 ERW square. That is the route I took, just stitch welded the 2 together, probably adds a tad more strength to that area as well ;) As you can see, it looks the part once fettled & painted :) ![]() |
Still very RED Ronnie.:D :D :D :D
|
Tell me about it Ginge :D :D
I have the Epoxy Mastic here, all I need to do now, is find the energy to get it from the tin to the chassis :o Pitty really, the build would leap ahead once that has been done, all of the other parts are here & all painted up, ready to fit :cool: |
Quote:
|
OK I'm sold - it doesn't look too bad.
Nice chassis BTW :) Thanks Matt |
All times are GMT +1. The time now is 04:53 AM. |
Powered by vBulletin® Version 3.6.4
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.