A full day of sticky wiring on Saturday, me and my dad unwrapped the entire loom and relocated everything into position and everything into the cockpit etc, to be fair it wasn't anywhere near as bad as I thought it would be, also we removed things not required like stop watch buttons, sidestand etc, we stripped the lighting back so we just have the feeds coming out of the fuse box, next job is get the lights and dash bits roughly in place and get wiried up
This morning we mocked up a new air box in card, I'm aiming to fab it up in aluminium, the problem is the top injectors, the std box is to high and out to the side, the new idea is a bit lower but not out to the side, I think if I did it as is I would need a bulge/scoop around 100mm high on the bonnet, I'm open to any ideas if anyone has any,
