View Single Post
  #5  
Old 29th December 2009, 09:45 PM
LeonN LeonN is offline
Senior Member
 
Join Date: Jul 2009
Location: Wirral
Posts: 146
Default

that is fare enough. unfortunately the sump hits the side of the rail rather than the top. so i need to take a bit of the bottom of my sump and some off the side. keeping the volume in the sump is going to be a bit tuff but if it must be worked out then work it out i will.

tar man.
Reply With Quote