View Single Post
  #17  
Old 5th June 2014, 09:51 PM
CJ27 CJ27 is offline
Junior Member
 
Join Date: Feb 2014
Posts: 17
Default

It's been a few weeks since I've managed any real progress on the chassis, a birthday trip to London and trying to complete some block paving at home have put pay to any real progress.

Fortunately I've managed a few hour this evening to carry on.

Having tacked most of the main chassis now I decided to move on to tacking up the diff cage area.



Main diff cage tacked up



And attached to the chassis



Once I'd got this tacked on I've now moved the chassis back to its original position on the build table and clamped it down in various places, I've began to check all my measurements and start to fully weld the top section of the chassis.

I've decided I'm going to tweet the front frame a bit, I'm not happy with the gap between the front frame and chassis tubes, I'll un tack and grind the welds down a bit and re line up and tack.

I've fully welded half of the top frame now,I need to fiddle with the welder a bit as the wire feed is playing up before I carry on.

Thanks for reading.
Reply With Quote