So
I have properly started now, the story so far, which is discussed in other threads,
  1. I got myself a part stripped donor with all the parts I needed, I then set about stripping it down, got our local travellers to come and take away the shell and sub frames so that was that.
  2. I built myself the build table, mainly to store all the donor parts under.
  3. I set about 'tinkering' while I waited for my flat pack. My half shafts where seized solid in the hubs and no matter what I did I couldn’t get them out. I decided to pop out the shafts, leaving the CV's in the hub and then used a really big hammer, that worked, just, then £40 on 2 new CV's and inner boots, a couple of coats of hammerite smooth and that’s them done. I also gave the uprights a coat of hammerite smooth, after a couple of hours with a wire brush obviously.
  4. Then ........................................ My flat pack came. Checked the parts after a couple of days and a few parts where missing but contacted Phil and he’s sending the missing parts over in the coming days.
  5. I had enough of the flat pack to start tacking it together and that is what I did last night.
  6. still have the bottom of the transmission tunnel to tack in by which time hopefully the rest of the flat pack arrives, the "U's" are some of the missing parts so can’t go much further till they arrive.
  7. I have sent all (I hope) plates that I need to the laser cutter including pedal box, wing stays, wishbone and shock brackets, roll bar plates, I think that’s it, they are ready and I will collect them next week so I will have plenty to get on with.

That’s the current stage of my build, will try to update regularly but there may be times where I don’t do much for a while. Also will not write so much next time as I know I prefer pictures to text so here they are.





__________________
God loves a trier

Actual cost so far = Have chosen to stop counting incase I incriminate myself -
Cost ive told the wife = A hell of a lot less than I have spent. -

Last edited by Dave F : 21st May 2016 at 09:53 AM.
Reply With Quote
  #2  
Old 21st May 2016, 09:47 AM
Dave F's Avatar
Dave F Dave F is offline
Senior Member
 
Join Date: May 2011
Location: Wakefield
Posts: 124
Default

and more:





__________________
God loves a trier

Actual cost so far = Have chosen to stop counting incase I incriminate myself -
Cost ive told the wife = A hell of a lot less than I have spent. -

Last edited by Dave F : 21st May 2016 at 09:54 AM.
Reply With Quote
  #3  
Old 21st May 2016, 10:13 AM
RichardH RichardH is offline
Senior Member
 
Join Date: May 2015
Location: fife scotland
Posts: 177
Default

looking good, the way your chassis sits now its worth getting some block of wood across each of the chassis rails and screwing down to the table , it will stop any twisting when welding, obviously at this point you are only tacking but it will still distort, i clamped as much as i could until the whole chassis was together and its straight as a die , ive read some horors of twisting as much as 10mm out
Reply With Quote
  #4  
Old 21st May 2016, 10:18 AM
Dave F's Avatar
Dave F Dave F is offline
Senior Member
 
Join Date: May 2011
Location: Wakefield
Posts: 124
Default

Quote:
Originally Posted by RichardH View Post
looking good, the way your chassis sits now its worth getting some block of wood across each of the chassis rails and screwing down to the table , it will stop any twisting when welding, obviously at this point you are only tacking but it will still distort, i clamped as much as i could until the whole chassis was together and its straight as a die , ive read some horors of twisting as much as 10mm out
Was thinking about screwing it to the table and was wondering the best way to do it. I will get some lenghts of timber and pin it to the table.
__________________
God loves a trier

Actual cost so far = Have chosen to stop counting incase I incriminate myself -
Cost ive told the wife = A hell of a lot less than I have spent. -
Reply With Quote
  #5  
Old 21st May 2016, 11:13 AM
rpjg1975 rpjg1975 is offline
Senior Member
 
Join Date: Jun 2009
Location: School Aycliffe, County Durham
Posts: 556
Default

I always think it's strange how small it looks from the bottom rails then as you progress it takes shape really quickly!! Don't forget to go side to side and front to back when welding to eliminate heat build up

Russ
Reply With Quote
  #6  
Old 21st May 2016, 11:16 AM
Dave F's Avatar
Dave F Dave F is offline
Senior Member
 
Join Date: May 2011
Location: Wakefield
Posts: 124
Talking

Quote:
Originally Posted by rpjg1975 View Post
I always think it's strange how small it looks from the bottom rails then as you progress it takes shape really quickly.
It does look small, I was thinking will I fit as I'm 6'2" but there are loads of people my hight and taller who fit just fine so I decided I was worring over nothing and I cracked another beer.

Quote:
Originally Posted by rpjg1975 View Post
Don't forget to go side to side and front to back when welding to eliminate heat build up
I assume this is when fully welding and not just tacking? If so that's what I was planning to do so was going to research the best way when it's all tacked
__________________
God loves a trier

Actual cost so far = Have chosen to stop counting incase I incriminate myself -
Cost ive told the wife = A hell of a lot less than I have spent. -

Last edited by Dave F : 21st May 2016 at 11:20 AM.
Reply With Quote
Reply


Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump


All times are GMT +1. The time now is 01:17 AM.


Powered by vBulletin® Version 3.6.4
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.