Haynes Forums  

Go Back   Haynes Forums > Haynes Roadster Forums > General discussion
FAQ Members List Calendar Search Today's Posts Mark Forums Read

 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
  #1  
Old 17th June 2017, 08:48 AM
twinturbo's Avatar
twinturbo twinturbo is offline
Super Moderator
 
Join Date: Jul 2008
Location: Carlisle
Posts: 4,393
Default Sumarise Where Your at...

So I thought this may generate some discussion.

Q1) How far along are you
Q2) How long since you last worked on the car
Q3) What are the major items to do
Q4) Whats holding you up


Q1) My chassis is fully trial fitted up and rolling, all the body work is mostly trial fitted and the seats have been test fitted. The dash was built including an ACEWELL cluster.

The 1.8CVH engine is in and has been run, the gearbox and prop are also in place although the rear gearbox mount needs finishing.

Rear lights are all done the mount for one front is 80% done.

Q2) November 2014 I think.

Q3)
Wiring.
Brakes
Roll Hoop
Cooling
Final strip and reassembly

Q4)
Stalled at doing the wiring, It's not that much of a job except when it comes to the dash which I think I counted 20+ wires to cram sort at the junction box. Since then Just been busy with other things and the garage has become an utter TIP!!

TT
__________________
You only get a woosh with a dump valve

Build Thread


Man Cave Mantiques



Cecil Street Auto Repairs Garage Carlisle




Build Cost £4181.65 - Last - Wheel Cylinders
Reply With Quote
 


Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump


All times are GMT +1. The time now is 09:17 PM.


Powered by vBulletin® Version 3.6.4
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.