#1
|
||||
|
||||
Sumarise Where Your at...
So I thought this may generate some discussion.
Q1) How far along are you Q2) How long since you last worked on the car Q3) What are the major items to do Q4) Whats holding you up Q1) My chassis is fully trial fitted up and rolling, all the body work is mostly trial fitted and the seats have been test fitted. The dash was built including an ACEWELL cluster. The 1.8CVH engine is in and has been run, the gearbox and prop are also in place although the rear gearbox mount needs finishing. Rear lights are all done the mount for one front is 80% done. Q2) November 2014 I think. Q3) Wiring. Brakes Roll Hoop Cooling Final strip and reassembly Q4) Stalled at doing the wiring, It's not that much of a job except when it comes to the dash which I think I counted 20+ wires to cram sort at the junction box. Since then Just been busy with other things and the garage has become an utter TIP!! TT
__________________
You only get a woosh with a dump valve Build Thread Man Cave Mantiques Cecil Street Auto Repairs Garage Carlisle Build Cost £4181.65 - Last - Wheel Cylinders |
Thread Tools | |
Display Modes | |
|
|