![]() |
#1
|
|||
|
|||
![]() As the title inplys
I have this coming week off work to work on my 7 i hope to get quite abit done. 1) Get prop balanced / make adapter (need a peice of 3 1/2 x 6 inch round steel bar for this if anyone has abit nocking around neer nottingham ![]() 2) Run brake and fuel pipes found a local place that makes up SS braided hoses quite cheep 3) make fuel tank with integral swirl pot (no need for a header tank) 4) get fuel pump 5) finish off pedal box 6) mount rad and oil cooler Ps GOT THE ENGINE RUNNING LAST NIGHT WHOOOOO ![]() ![]() managed to figure out how the imobaliser worked and a few cough cough splutter splutters later off it went on its jolly way to 10500 RPM with no exaust....was quite load ![]() Chears Tilly |
Thread Tools | |
Display Modes | |
|
|