#1
|
|||
|
|||
woo. Got a week off to work on the car !
As the title inplys
I have this coming week off work to work on my 7 i hope to get quite abit done. 1) Get prop balanced / make adapter (need a peice of 3 1/2 x 6 inch round steel bar for this if anyone has abit nocking around neer nottingham 2) Run brake and fuel pipes found a local place that makes up SS braided hoses quite cheep 3) make fuel tank with integral swirl pot (no need for a header tank) 4) get fuel pump 5) finish off pedal box 6) mount rad and oil cooler Ps GOT THE ENGINE RUNNING LAST NIGHT WHOOOOO managed to figure out how the imobaliser worked and a few cough cough splutter splutters later off it went on its jolly way to 10500 RPM with no exaust....was quite load Chears Tilly |
Thread Tools | |
Display Modes | |
|
|