Haynes Forums  

Go Back   Haynes Forums > Haynes Roadster Forums > Chassis
FAQ Members List Calendar Search Today's Posts Mark Forums Read

 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
  #2  
Old 26th September 2009, 08:21 PM
HandyAndy's Avatar
HandyAndy HandyAndy is offline
Senior Member
 
Join Date: Jan 2009
Location: cleveland
Posts: 3,917
Default

not saying this is what everyone does but this is what i did....

fully weld the joints of the BR1/BR3/U3 & same on drivers side then i ground flat the points where the diagonals D1/D3 etc meet these points so that you get a very close mating of the surfaces for when you fully weld the chassis, if that makes sense too same idea at the SB1 area too.

as for fully welding, do this when everything is tacked into place & you,ve checked all measurements are correct using page 38 & 43 & 45 as dimension checks.

Ash G has suggested that to get a weld into a tight area such as where D1 meets BR1/U3, then to have a spare welding shroud & carefully squeeze the end enough to allow easier access with the welding torch but don,t allow the welding tip to touch the squashed shroud.

hope this helps.

andy
__________________
Flat Pack Chassis Kits for sale, contact me at andyroadster@yahoo.co.uk
Reply With Quote
 


Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump


All times are GMT +1. The time now is 09:21 AM.


Powered by vBulletin® Version 3.6.4
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.