Haynes Forums  

Go Back   Haynes Forums > Haynes Roadster Forums > Announcements
FAQ Members List Calendar Search Today's Posts Mark Forums Read

 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
  #33  
Old 2nd December 2010, 07:39 PM
Davey's Avatar
Davey Davey is offline
Senior Member
 
Join Date: Dec 2009
Location: Telford
Posts: 1,040
Default

Due to the weather I've been able to spend a good couple of hours on the Dragon today. I've now got the rear end all framed up and 90% welded, only the underneath bits to do once its all stripped down and I can flip it over to do them. I've framed the transmission tunnel up and again that is welded on the top sides. I rebuilt the scuttle frame a week or two ago, just a couple of bits left to do on that and sort out the pedal box finally and I'll have a completed chassis . Then it'll be time to strip it all down, flip it over and weld the undersides then grit blast it and paint it.

I'm using the fuel tank that was fitted to the original Locust which measurements show should hold six gallons of go go juice so it should have a fair range unless I get a touch of leadfoot disease . I'm going to make the rear tub panels in three sections with the actual rear one as a separate removable panel so I can get the tank out should I ever need to.

Not sure when I can get any photos as I've got a big job in tomorrow and rebuilding/redecorating the front room over the weekend but I'll try soon.

D.
__________________
visit my website at www.cossie.davenewell.co.uk
Reply With Quote
 


Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump


All times are GMT +1. The time now is 10:17 AM.


Powered by vBulletin® Version 3.6.4
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.