Haynes Forums  

Go Back   Haynes Forums > Haynes Roadster Forums > General discussion
FAQ Members List Calendar Search Today's Posts Mark Forums Read

 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
  #2  
Old 18th December 2010, 12:28 PM
Tatey's Avatar
Tatey Tatey is offline
Senior Member
 
Join Date: May 2009
Location: Leicester
Posts: 827
Default

Well I've picked up all of my wheel studs and once I've cleaned up all of my hubs and painted them I'll be getting into fitting them.

Yesterday I picked up the 50x50 box for my work bench, and I've been continuing to make the steel plates to hold it all together. I've made all of the plates needed for the feet, however when I came to weld the nuts onto 4 of the plates for the adjustable feet, I'd found my house mate has used all of my welding gas, as well as breaking my 3mm drill bit and M3 tap. Safe to say I'm not happy as its been over a week since he's worked in the garage and he could have told me that he used all of my gas as it tends to be a right pain to get hold of co2 so I could have organised getting some earlier on.

I may however take the opportunity to change to argon mix, however this also means I will need to buy a new reg for £30.

But my work bench is definitely progressing and I'm really impressed with it so far.
__________________
1.8 Silvertop Zetec (ZX6R Carbs + Megajolt) + Type 9

My Build Blog: http://www.haynes.co.uk/forums/showthread.php?t=2736 - Last Update: 31st October 2020

Total Spent so far: Stopped counting
Reply With Quote
 


Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump


All times are GMT +1. The time now is 11:27 AM.


Powered by vBulletin® Version 3.6.4
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.