Haynes Forums  

Go Back   Haynes Forums > Haynes Roadster Forums > Announcements
FAQ Members List Calendar Search Today's Posts Mark Forums Read

 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
  #26  
Old 19th October 2011, 05:05 PM
CTWV50's Avatar
CTWV50 CTWV50 is offline
Senior Member
 
Join Date: Aug 2010
Posts: 1,297
Default

It's coming along slowly, I only get about 6 hrs a week at weekends in the garage, but I have spent ages measuring, checking and getting the rear diff cage suspension brackets etc in the right place.

This weekend I'll test fit the diff and finish up on the back end less the rear tub mounting as I think I've changed my mind and will go with a fibreglass tub.

Then do some more full welding and put it on it's wheels, then I'll do the steering supports and spray the whole frame with u-pol weldthrough zinc primer.

Then see if I can't get it steering on it's wheels.

I do spend most of my time trying to figure out how I will organise the garage space at each stage of the build! It's doing my head in!!

Last edited by CTWV50 : 19th October 2011 at 05:09 PM.
Reply With Quote
 


Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump


All times are GMT +1. The time now is 03:10 PM.


Powered by vBulletin® Version 3.6.4
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.