Haynes Forums  

Go Back   Haynes Forums > Haynes Roadster Forums > General discussion
FAQ Members List Calendar Search Today's Posts Mark Forums Read

 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
  #34  
Old 22nd June 2012, 09:18 AM
Tatey's Avatar
Tatey Tatey is offline
Senior Member
 
Join Date: May 2009
Location: Leicester
Posts: 827
Default

Well the floor is now in place and the engine is back in, here are a couple of pictures of it, it seems very study with minimal flex, I used 2mm 5251 grade ali for the floor with rivets placed every 50mm, I was surprised at how quickly I managed to rivet it in place, it took about 45 minutes from putting the sikaflex on to putting in the last rivet.





Also my mate came round and gave me a hand re-wrapping the rear wheel arch, it was so much easier with 2 people, one to hold the vinyl/use the heat gun and the other to smooth it down, it did take an hour and a half to do though, but I am happy with the results. I think I will be putting some edge trim around the edge of the wheel arch just to finish it off and prevent the vinyl from moving.



The next job on the list is to do the interior panels and run brake, fuel and electrical lines, I am ordering some aluminium strip from Aalco at the minute so I can do lines over the weekend.
__________________
1.8 Silvertop Zetec (ZX6R Carbs + Megajolt) + Type 9

My Build Blog: http://www.haynes.co.uk/forums/showthread.php?t=2736 - Last Update: 31st October 2020

Total Spent so far: Stopped counting

Last edited by Tatey : 22nd June 2012 at 09:16 PM.
Reply With Quote
 


Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump


All times are GMT +1. The time now is 06:37 PM.


Powered by vBulletin® Version 3.6.4
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.