Haynes Forums  

Go Back   Haynes Forums > Haynes Roadster Forums > Chassis
FAQ Members List Calendar Search Today's Posts Mark Forums Read

 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
  #15  
Old 25th November 2008, 03:57 PM
Cobra289 Cobra289 is offline
Junior Member
 
Join Date: Jun 2008
Posts: 29
Default

Quote:
Originally Posted by AdrianH View Post

I think I prefer steel floor and stitch welding using Zinc weld through primer to provide some protection, then just use Sikaflex to seal the seams.

I have just had an idea, what about spot welding the floor to the chassis rails. Has anyone done that before? That would be less distortion then stitch welding, but I guess could only be done on the outer rails and not the transmission tunnel ones.

Adrian
I agree with the Sikaflex to seal the seams, or some Epoxy putty.

A friend of me did make holes of 6 mm at the steel plate at the edges rails but also at the tunnel rails, he did fill weld the holes and he is pretty shore that it is better than stitched welds. No distortion of chassis, like some people think about.
The fill welds where made jumping from corner to corner to spread the heat, and the plate is about 6 mm from the edge so that the holes are close to the inside wall of the tube.

Regards,
Cobra289
__________________
http://www.donostia.demon.nl
'Improvement' means that you recognize previous mistakes!
Reply With Quote
 


Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump


All times are GMT +1. The time now is 06:19 AM.


Powered by vBulletin® Version 3.6.4
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.