![]() |
|
#34
|
||||
|
||||
|
I've now finished my right hand side tunnel panel and fitted my OBP passenger footrest, I was going to start the rear tub and other panels this weekend but have decided that I will wait until my 10m of corrugated cardboard arrives (only cost £5 so I think it should be worth it. I've also ordered some rivnuts and some more nuts, so I should be able to start fitting bodywork shortly.
__________________
1.8 Silvertop Zetec (ZX6R Carbs + Megajolt) + Type 9 My Build Blog: http://www.haynes.co.uk/forums/showthread.php?t=2736 - Last Update: 31st October 2020 Total Spent so far: Stopped counting
|
| Thread Tools | |
| Display Modes | |
|
|