![]() |
#8
|
||||
|
||||
![]() I've got two other flat packs to do so if I set the saw and mill up for it a cut it makes sense to run half a dozen off at the same time, lead time on a flat pack is currently 10 days to 6 months.
![]() |
Thread Tools | |
Display Modes | |
|
|