![]() |
#24
|
||||
|
||||
![]() Well its been 9 months since I last posted a picture of my build update but one is finally here!
I've nearly completed one of my sidepanels, I just need to trim the bottom edge, and put a few more clearance cuts in for a wishbone + steering rack. I hasnt been too difficult, but I think if I did it again I would go for fibreglass panels just for ease and speed. I think I will mount the rear arch once this panel is in place as it will give me a break from panel beating for an hour or two. I also need to fabricate the rear section of the panel for the curved part of the chassis, that will be done after this is finished. ![]() I'm hoping to have the other sidepanel finished by the end of next bank holiday weekend (with a couple of days mountain biking in Wales planned).
__________________
1.8 Silvertop Zetec (ZX6R Carbs + Megajolt) + Type 9 My Build Blog: http://www.haynes.co.uk/forums/showthread.php?t=2736 - Last Update: 31st October 2020 Total Spent so far: Stopped counting ![]() |
Thread Tools | |
Display Modes | |
|
|