Haynes Forums  

Go Back   Haynes Forums > Haynes Roadster Forums > Bodywork and interior
FAQ Members List Calendar Search Today's Posts Mark Forums Read

Reply
 
Thread Tools Display Modes
  #11  
Old 12th December 2015, 03:16 AM
norton norton is offline
Senior Member
 
Join Date: May 2015
Posts: 434
Default

I drill though the tube so each insert is welded around each end. It's solid!
Reply With Quote
  #12  
Old 12th December 2015, 05:23 PM
twinturbo's Avatar
twinturbo twinturbo is offline
Super Moderator
 
Join Date: Jul 2008
Location: Carlisle
Posts: 4,393
Default

25mm Box, 2mm Chequer Floor, Bolted throught with noo crush.

TT
__________________
You only get a woosh with a dump valve

Build Thread


Man Cave Mantiques



Cecil Street Auto Repairs Garage Carlisle




Build Cost £4181.65 - Last - Wheel Cylinders
Reply With Quote
  #13  
Old 12th December 2015, 09:17 PM
SteveH SteveH is offline
Member
 
Join Date: May 2015
Posts: 76
Default

i cut some 25mm box today and put the rivnuts in
it does look quite solid
but im going to do 2 tubes fitted with crush tubes and then ill decide
Reply With Quote
  #14  
Old 19th March 2016, 02:48 PM
tom hill tom hill is offline
Junior Member
 
Join Date: Oct 2008
Location: Frome, Somerset
Posts: 6
Default

I used m8 rivnuts in 25mm box, worked great and very neat. I use the theory it is the 4 point harness that takes the load in an accident, not the seat.
Reply With Quote
Reply


Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump


All times are GMT +1. The time now is 02:29 AM.


Powered by vBulletin® Version 3.6.4
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.