Haynes Forums  

Go Back   Haynes Forums > Haynes Roadster Forums > Engine/transmission
FAQ Members List Calendar Search Today's Posts Mark Forums Read

 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
  #1  
Old 15th September 2011, 01:31 PM
brainbug007's Avatar
brainbug007 brainbug007 is offline
Senior Member
 
Join Date: Nov 2010
Location: Weston-Super-Mare
Posts: 846
Default Propshaft

I tried calling up a local company today to look into getting my propshaft shortened and it was a confusing call to say the least! It sounds like they seem to think they would in theory have to make a new propshaft with a sleeve?? at the top followed by the universal join and a flange at the end to connect to the diff. He didn't seem to think there would be enough material at the bottom of my old propshaft so it would be a new one which he said would be around £170+vat! I wasn't expecting it to be as much as that as there's some other threads on here where people have got them shortened or even new ones for much less? Can anyone explain what he was talking about with the sleeves at the top? I thought the top would remain unchanged and would just bolt onto the gearbox as is, and he would just take a chunk out the longer bottom section and then re-balance it?
Reply With Quote
 


Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump


All times are GMT +1. The time now is 12:47 AM.


Powered by vBulletin® Version 3.6.4
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.