Haynes Forums  

Go Back   Haynes Forums > Haynes Roadster Forums > Announcements
FAQ Members List Calendar Search Today's Posts Mark Forums Read

Reply
 
Thread Tools Display Modes
  #201  
Old 23rd October 2015, 04:16 PM
SteveH1 SteveH1 is offline
Senior Member
 
Join Date: Jun 2015
Location: Dublin Ireland
Posts: 291
Default

Is it a bead ur looking to create to stop the hose coming off
__________________
Slowly tipping over the edge into madness
Reply With Quote
  #202  
Old 23rd October 2015, 04:48 PM
norton norton is offline
Senior Member
 
Join Date: May 2015
Posts: 434
Default

Yes that's the goal.
Reply With Quote
  #203  
Old 23rd October 2015, 04:56 PM
SteveH1 SteveH1 is offline
Senior Member
 
Join Date: Jun 2015
Location: Dublin Ireland
Posts: 291
Default

Ok so measure the circumference of the pipe and cut a piece of copper brake line to this length
Then split the pipe along its length and push the split onto the lip of the pipe all the way around and solder in place.
Assuming its steel as i dont know if you can solder ali
__________________
Slowly tipping over the edge into madness
Reply With Quote
  #204  
Old 23rd October 2015, 05:51 PM
K4KEV's Avatar
K4KEV K4KEV is offline
Senior Member
 
Join Date: Feb 2010
Location: WINGATE CO DURHAM
Posts: 1,511
Default

rather than split it grind it back on one side until you can easily push through then you can push it on and solder....that is how I got a rounded edge on my exhaust tip...... for beads to keep pipes on simply bash a piece of brake pipe or cut a strip from a copper pipe and roll it around then solder ...did it on some of my steel water pipes
Reply With Quote
  #205  
Old 23rd October 2015, 06:05 PM
SteveH1 SteveH1 is offline
Senior Member
 
Join Date: Jun 2015
Location: Dublin Ireland
Posts: 291
Smile

Yea musta been your thread i seen it on
__________________
Slowly tipping over the edge into madness
Reply With Quote
  #206  
Old 24th October 2015, 01:30 AM
norton norton is offline
Senior Member
 
Join Date: May 2015
Posts: 434
Default

Ok so, standard.



Standard facing forward.



The intended finished arrangement. This my spare inlet with the 90 degree bit chopped off.



Reply With Quote
  #207  
Old 24th October 2015, 09:06 AM
Rosco Rosco is offline
Senior Member
 
Join Date: Sep 2014
Posts: 493
Default

Ok so why couldnt we just chuck on the inside of the tube and turn a grove in?
__________________
http://www.haynes.co.uk/forums/showthread.php?t=13517

My Build Thread
Reply With Quote
  #208  
Old 24th October 2015, 09:34 AM
norton norton is offline
Senior Member
 
Join Date: May 2015
Posts: 434
Default

The id is about 28mm. Have you any internal jaws that small?
Reply With Quote
  #209  
Old 24th October 2015, 12:39 PM
norton norton is offline
Senior Member
 
Join Date: May 2015
Posts: 434
Default

Pedal box is more or less done. I need to hook up the hydraulics and test it. I also glued some this rubber flooring to the floor as it just felt like it needed it. Should dampen the floor panel too.





Reply With Quote
  #210  
Old 24th October 2015, 11:30 PM
Rosco Rosco is offline
Senior Member
 
Join Date: Sep 2014
Posts: 493
Default

Quote:
Originally Posted by norton View Post
The id is about 28mm. Have you any internal jaws that small?
I will have a look in the morning
__________________
http://www.haynes.co.uk/forums/showthread.php?t=13517

My Build Thread
Reply With Quote
Reply


Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump


All times are GMT +1. The time now is 02:46 PM.


Powered by vBulletin® Version 3.6.4
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.