Haynes Forums  

Go Back   Haynes Forums > Haynes Roadster Forums > General discussion
FAQ Members List Calendar Search Today's Posts Mark Forums Read

Reply
 
Thread Tools Display Modes
  #241  
Old 4th October 2012, 11:37 PM
mgglep's Avatar
mgglep mgglep is offline
Senior Member
 
Join Date: Apr 2011
Location: leicestershire
Posts: 212
Default

I did exactly the same thing I used 3 mm Ali for floor and tank I used 3/16 rivets and sika I used countersunk rivets on the edge where the side panels go I am hoping the panels will go over
__________________
17.07.10 "Now i know the meaning of life"
My Build pics
http://www.flickr.com/photos/67605695@N04/
http://www.flickr.com/photos/97412063@N08/
Reply With Quote
  #242  
Old 5th October 2012, 02:58 PM
K4KEV's Avatar
K4KEV K4KEV is offline
Senior Member
 
Join Date: Feb 2010
Location: WINGATE CO DURHAM
Posts: 1,511
Default

Queer thing is Andy my current Ebay feedback is 999 ....me thinks something devilish is going on
mg you should be ok as long all the dimensions are correct but it will be close, which is what you want anyway
Reply With Quote
  #243  
Old 6th October 2012, 01:27 AM
K4KEV's Avatar
K4KEV K4KEV is offline
Senior Member
 
Join Date: Feb 2010
Location: WINGATE CO DURHAM
Posts: 1,511
Default

Started on pipework today and got some p clipped inside the trans tunnel
the ally I'm using to mount p clips to is a corner strengthener that plasterers use
I cut along the apex to give me two flat bits.
I purposely left the nearside floor off to make fitting the pipes easier




Reply With Quote
  #244  
Old 6th October 2012, 09:46 PM
Oscar Oscar is offline
Senior Member
 
Join Date: Sep 2010
Location: Wincanton
Posts: 202
Default

This is what I love about this forum, the ingenuity!

Will have to have a word with my cousin (a master plasterer) about getting some of that, the greatest form of flattery is imitation!
__________________
Photos of the project so far:

http://www.flickr.com/photos/oscarss/sets/
Reply With Quote
  #245  
Old 7th October 2012, 02:47 AM
K4KEV's Avatar
K4KEV K4KEV is offline
Senior Member
 
Join Date: Feb 2010
Location: WINGATE CO DURHAM
Posts: 1,511
Default

good progress today....have just about completed the petrol and brake pipe mounting throughout the trans tunnel, got a bit busy on that side so decided to mount the loom clips on the other side....will be getting the other floor on later today
I did manage to do the trans tunnel with just 10 fixings
from the engine bay


complicated bending near the diff mount


one of Sylvains flexy lines was easy to hop over the fuel feed/return
Reply With Quote
  #246  
Old 7th October 2012, 09:27 AM
robo robo is offline
Senior Member
 
Join Date: Jun 2011
Location: scabs
Posts: 1,722
Default

Quote:
Originally Posted by Oscar View Post
This is what I love about this forum, the ingenuity!

Will have to have a word with my cousin (a master plasterer) about getting some of that, the greatest form of flattery is imitation!
I reckon Chapman would have been proud of that one Kev

Bob
__________________
When The Results Disagree With The Theory: Believe The Results And Invent A New Theory
If I had two brains I,d still be a halfwit

The cave http://s1116.photobucket.com/user/my...deshow/mancave

The build http://www.haynes.co.uk/forums/showthread.php?t=12669
Reply With Quote
  #247  
Old 7th October 2012, 10:40 AM
voucht's Avatar
voucht voucht is offline
Senior Member
 
Join Date: Jun 2011
Location: Lautrec, Tarn (81), Occitanie, France
Posts: 879
Default

Very neat installation Kev, it is brilliant (and looks good )
Just a question: why the central brake line has to cross the fuel lines? Why haven't you routed the fuel lines all the way on top of the brake line, which would have been routed all the way on the lowest part of your ally strip? It would also have allowed a larger curve-radius on the bend of the brake line to turn around CP14 and connect to the tee-piece.
But I'm sure there is a reason
Reply With Quote
  #248  
Old 7th October 2012, 11:37 AM
The V8 Files The V8 Files is offline
Senior Member
 
Join Date: Jul 2011
Location: Biggleswade, Bedfordshire
Posts: 346
Default

Liking the progress Kev
Reply With Quote
  #249  
Old 7th October 2012, 05:37 PM
K4KEV's Avatar
K4KEV K4KEV is offline
Senior Member
 
Join Date: Feb 2010
Location: WINGATE CO DURHAM
Posts: 1,511
Default

Mmmm....might try to swap those around Sylvain or at least top one for bottom one.....got the diff area all p clipped off
rob....I will list everything that I have used as a part off at the end of my build and the list will be quite comprehensive





plastic clips pop riveted on to hold loom in place
Reply With Quote
  #250  
Old 9th October 2012, 12:26 PM
K4KEV's Avatar
K4KEV K4KEV is offline
Senior Member
 
Join Date: Feb 2010
Location: WINGATE CO DURHAM
Posts: 1,511
Default

I have had a little rethink regarding my pipework down the trans tunnel.....not having the diff or handbrake cable mounted meant my guesswork regarding them was way out, so I have reworked them to clear the above items, one pipe I had to feed through the diff bracket which worked out quite well and I have moved the brake pipe down to the bottom to stop from crossing over as Sylvain pointed out, so here are the new trans tunnel pipework photo's

From the engine bay


to the tank (feed & return) with homemade olives soldered on


getting around the diff with out fouling


another angle
Reply With Quote
Reply


Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump


All times are GMT +1. The time now is 04:32 PM.


Powered by vBulletin® Version 3.6.4
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.