#21
|
||||
|
||||
Thanks for the help guys, spent ages today holding the little triangle all over the chassis, then finally found it!
My grinder packed in this afternoon, but when i got home found that it was just a wire had snapped inside the flex. So can crack on again tomorow. By the end of tomorow i hope to have the rest of the wishbones cut (and possibly weld one or two) and get the suspension brackets and seat rails welded on the chassis. Then i'm waiting to get some M8 nuts for the roll bar mounts (i've only got stainless ones at the moment) which means i can get the back end of the chassis finished, then some 7/16 unf nuts for the seatbelt mounts (the shop that sells them is only open mon-fri 9-4.30 when i'm ususally at work) After that, the chassis is about finished, besides engine mounts and headlamp brackets
__________________
~ My Build Diary - http://davesroadster.blogspot.com/ *updated 7/6/11* Best bit so far: Getting it running Worst bit so far: Cutting steel for wishbones and engine mounts. Most annoying bit so far: Generator packing up half way through welding. Last edited by David_17 : 24th July 2010 at 05:04 PM. |
Thread Tools | |
Display Modes | |
|
|