#1
|
||||
|
||||
Build Officially Started!
I've officially started my build now!
HandyAndy, has very kindly lent me his build table and i've now started assembling it all. My garage suddenly seems much smaller with an 8'x4' build table in the middle of it Although 2 steps forward, 1 step back. My recently purchased MIG welder (Clarke 151EN) has got a faulty gas valve, so the torch leaks a small amount of gas, even when the trigger isnt depressed. I've ordered a new one at the grand cost of £18.85 delivered, so all is not lost . Theres always a silver lining though as it now means i've got all weekend to ensure the bottom rails are perfect without my MIG trying to tempt me into rushing ahead . I'll start a build blog shortly and put the link in my signature. I'd just like to thank HandyAndy and the rest of you's in getting me to this stage so far, im sure i'll require more help in the future though Cheers Tatey
__________________
1.8 Silvertop Zetec (ZX6R Carbs + Megajolt) + Type 9 My Build Blog: http://www.haynes.co.uk/forums/showthread.php?t=2736 - Last Update: 31st October 2020 Total Spent so far: Stopped counting Last edited by Tatey : 11th September 2009 at 08:16 PM. |
#2
|
|||
|
|||
Nice one Tatey go for it,shout if you get stuck.
|
#3
|
||||
|
||||
all the best for your build mate,
the chassis outline on the table is just about visible under the coffee mug stains enjoy your build & you know where i am if needed, watch out for the front frame andy
__________________
Flat Pack Chassis Kits for sale, contact me at andyroadster@yahoo.co.uk |
#4
|
||||
|
||||
Wow.....
I've been doing a running total of all of the costs of my build. So far the total is......£601.03 The majority being tool costs, the main being my MIG which owed me £200 now , i knew the bloody things where expensive Although i've now got pretty much a fully functioning 'workshop', all of the steel for my build, my roll bar and steering rack, so i should be sorted for the next few months.
__________________
1.8 Silvertop Zetec (ZX6R Carbs + Megajolt) + Type 9 My Build Blog: http://www.haynes.co.uk/forums/showthread.php?t=2736 - Last Update: 31st October 2020 Total Spent so far: Stopped counting |
#5
|
||||
|
||||
Quote:
Can I just ask, Is that for the compleat gun, or just the little brass jobbie inside? Also where did you get it from? My wife asked at Machine Mart when she collected some stuff for me. They just told her to get it from the parts dep't.....????? Cheers David |
#6
|
||||
|
||||
Its just for the little brass jobbie inside (although its now aluminium/brass). If you sign up to the MIG welding forum and PM a guy called weldequip. He'll be able to sort you out. He's a clarke supplier and a really nice guy (called Steve), really seems to know his stuff.
I ordered £80.04 worth of bits, new swan neck, regulator, tips, shrouds and wire at 3pm on tues last week, and i received it next day via parcelforce. He even knocked the postage price off for me when i ask for student/armed forces discount He's highly recommended on the MIG welding forum. Simon
__________________
1.8 Silvertop Zetec (ZX6R Carbs + Megajolt) + Type 9 My Build Blog: http://www.haynes.co.uk/forums/showthread.php?t=2736 - Last Update: 31st October 2020 Total Spent so far: Stopped counting |
#7
|
||||
|
||||
Cheers for that mate.
I'll give him a try. David |
#8
|
||||
|
||||
machine mart have a mail order parts department the number is on the back of the calalogue.
to be honest i wouldnt bother with them just go to weldquip on the mig welding forum. i ordered a new bit for my engine lift from machine mart and it took 2months to turn up. |
#9
|
||||
|
||||
Oh so thats where the MM parts dep't is.
Anyway, I'm waiting for their next VAT free day. I think I'm going to buy a new welder. The one I got really is on it's last legs, it'll only run a couple of mins before it overheats. I'm going to get the new valve for it though. I leave it in the UK for the odd jobs there. David PS....Any idea when Maidstone MM is having their next VAT free day ? Last edited by dogwood : 13th September 2009 at 09:21 AM. |
#10
|
||||
|
||||
Well i've now got the bottom rails fixed onto the build table, all of the dimensions seem to be perfect . I've also cut U3-U6 and nearly finished the front frame, i just need to make a jig and cut the 14 degree angle at the top, but i need my new gas valve for my MIG before i can do that.
So now its a waiting game as i dont want to cut anymore bits before i've got everything tacked together.
__________________
1.8 Silvertop Zetec (ZX6R Carbs + Megajolt) + Type 9 My Build Blog: http://www.haynes.co.uk/forums/showthread.php?t=2736 - Last Update: 31st October 2020 Total Spent so far: Stopped counting |
Thread Tools | |
Display Modes | |
|
|