Haynes Forums

Haynes Forums (http://www.haynes.co.uk/forums/index.php)
-   Announcements (http://www.haynes.co.uk/forums/forumdisplay.php?f=2)
-   -   Petrol tank finished (http://www.haynes.co.uk/forums/showthread.php?t=5724)

Andy_B 21st January 2011 05:52 PM

Petrol tank finished
 
First attempt at Ali welding so be gentle...pressure tested to 5bar only one leak (arrow) now re welded.. Sump made from 5" pipe ...filler from a section of zip up scaffolding (now a bit wobbly) !!


http://i1229.photobucket.com/albums/...t/P1210100.jpg
http://i1229.photobucket.com/albums/...t/P1210101.jpg
http://i1229.photobucket.com/albums/...t/P1210102.jpg

Even think i have learned between direct link and hyper link pics !!

twinturbo 21st January 2011 05:58 PM

well done

did you tig it?

TT

Andy_B 21st January 2011 05:59 PM

Yes Tig welded wish i had used the current setting i used to fix the leak ...i cranked it up a bit and had to go like the clappers...but much neater..

mark 21st January 2011 08:02 PM

5 bar :eek: :eek: :D or did you mean psi?

You can be confident about your first attempt at ali if it can hold 5 bar :)

Andy_B 21st January 2011 09:17 PM

it did kinda balloon at the sides a wee bit but better safe than sorry !!!:)

AshG 21st January 2011 11:06 PM

i would check you baffle in the middle. i did that on mine and cracked the welds first time round :(


All times are GMT +1. The time now is 03:12 PM.

Powered by vBulletin® Version 3.6.4
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.