Q1) Rolling Chassis, engine in (temporarily) pedalbox just about completed 
 
Q2) Did 3 hours Wednesday, 4 hours the week before, that was after a 3 month break #revitalised.  
 
Q3) in order (maybe some overlap):  
1. Fuel - tank fitting, copper, filter, rubber. 
2. Engine - removal, Timing belt, water pump, some gaskets, painting, refitting 
3. Brakes - copper, flexi's, handbrake cable securing 
4. Cooling - Radiator, expansion bottle, pipes 
5. Wiring - test while complete, remove redundant circuits, retest, fix inevitable problems, tidy up. 
6. Bodywork - Trail fit, lights, remove, paint, refit, then drop something on my nice fresh body work - swear. 
 
Q4) wife, Silly season at work, kids, wife, money, wife, time, kids 
		
	
		
		
		
		
			
				__________________ 
				God loves a trier
Actual cost so far = Have chosen to stop counting incase I incriminate myself -    
Cost ive told the wife = A hell of a lot less than I have spent. -   
			 
		
		
		
		
	
		
		
	
	
	 |