![]() |
|
#4
|
||||
|
||||
![]() Q1) Rolling Chassis, engine in (temporarily) pedalbox just about completed
Q2) Did 3 hours Wednesday, 4 hours the week before, that was after a 3 month break #revitalised. Q3) in order (maybe some overlap): 1. Fuel - tank fitting, copper, filter, rubber. 2. Engine - removal, Timing belt, water pump, some gaskets, painting, refitting 3. Brakes - copper, flexi's, handbrake cable securing 4. Cooling - Radiator, expansion bottle, pipes 5. Wiring - test while complete, remove redundant circuits, retest, fix inevitable problems, tidy up. 6. Bodywork - Trail fit, lights, remove, paint, refit, then drop something on my nice fresh body work - swear. Q4) wife, Silly season at work, kids, wife, money, wife, time, kids
__________________
God loves a trier Actual cost so far = Have chosen to stop counting incase I incriminate myself - ![]() Cost ive told the wife = A hell of a lot less than I have spent. - ![]() |
Thread Tools | |
Display Modes | |
|
|