View Single Post
  #16  
Old 23rd January 2012, 12:38 AM
Toyotus Toyotus is offline
Junior Member
 
Join Date: Dec 2011
Posts: 14
Default


Here is the pedal base/box with all tabs welded on and painted. Leaving all holes undrilled until I'm ready to mount master cylinders/cable guide, ect. I had a hard time finding a sleeve for the pivot bolts. Finally found exactly what I needed in stainless, for $5.49/ft.! Luckily that did all three bushings and a castor wheel for my creeper!
I actually drilled and tapped and installed some 5/32 grease zirks too, as I still perfer the idea of the nylon riding on the bolt, instead of metal on metal, might as well just use a solid 1" (25mm) spacer drilled for the pivot bolt. Either way, I suppose this will be longer lasting this way.

Last edited by Toyotus : 23rd January 2012 at 12:42 AM.
Reply With Quote